CASE STUDIES

 

 

 

 

Wrightington Hospital – BIM & FM Integration

Building Information Modelling (BIM) was adopted from the outset on the £18m Wrightington Hospital by main contractor, Integrated Health Projects (IHP) – a joint venture between Vinci Construction and Sir Robert McAlpine, as part of their structured programme from design concept to post-completion...

Bolton Interchange – Onsite BIM Station

A BIM Station is a high powered computer which acts as a go to location for all operatives to use. Housing the latest project information, the station is specifically positioned on site for communal use to aid the viewing of a project’s BIM Model and drawings providing easy access for all staff...

The Soapworks, Home Office & MoJ – BIM Adoption

Occupying over 160,000 sqft of The Soapworks, The Home Office relocated its current operations from a number of separate premises around the Greater Manchester area under one roof...

© Copyright 2018 - All Rights Reserved   |   Group Headquarters: Denton Hall,  Ilkley, West Yorkshire, LS29 0HH   |   Tel: 0800 140 4400   |   Contact Us   |   Terms & Conditions   |   Privacy Policy